From prints to closeout in four steps

The same sequence on every job, so you always know where your segment stands and what comes next.

Get in touch
Step 01

Review the Route

We walk the route with the prints in hand, check permits and right-of-way conditions, and raise problems before they turn into change orders.

  • The route walked and compared to the prints
  • Questions and conflicts sent back to you in writing
  • A crew plan and start date
Step 02

Locate and Verify

No drilling starts until the ground is understood. Locates are called, marks are checked, and every crossing is exposed.

  • 811 tickets called and kept current
  • Marks checked against the prints
  • Every crossing potholed and recorded
  • Conflicts reported to you the same day
Step 03

Bore and Place

The pilot bore is steered and tracked, the hole is reamed, and the conduit is pulled back. Then structures are set and fiber is placed to plan.

  • Depth and position recorded on every shot
  • Conduit proofed before handoff
  • Handholes and vaults set to grade
  • Daily footage updates while the crew is on your job
Step 04

Restore and Close Out

The site is restored and the segment is closed out with the paperwork you need for as-builts and billing.

  • Surface restored, with before-and-after photos
  • Bore logs and redlines turned in with the segment
  • Footage totals for billing
  • A walkthrough on request

What we need from you

To get started

  • Prints and any permits for the route
  • The scope: footage, conduit count and size, structures
  • The schedule and any milestone dates
  • Your point of contact for the field and for billing

Ready when your prints are.

Send us the route and schedule, and we will follow up within one business day.