Gulf South Underground Utilities

01Services

Underground construction for fiber networks

We handle the underground scope of fiber projects for prime contractors: drilling, conduit, fiber, structures, and restoration, with the paperwork to close each segment out.

Get in touch
01

Horizontal Directional Drilling

Directional drilling installs conduit under roads, driveways, ditches, waterways, and existing utilities without cutting the surface open. It is the standard method for crossings and for long runs through tight rights-of-way.

How we do it
  • Every crossing on the path is located and potholed before the pilot bore starts.
  • The pilot bore is steered and tracked with a walkover locator, with depth and position recorded along the path.
  • The hole is reamed to size and the conduit is pulled back in one continuous run.
  • Drilling fluid is contained and cleaned up, and entry and exit pits are backfilled.
What you get
  • A bore log with depth and station readings for each shot
  • Redlines showing the as-built bore path
02

Conduit and Innerduct Placement

We place HDPE conduit and innerduct to the depth and configuration on the prints, by bore, open trench, or plow, depending on the ground and the right-of-way.

How we do it
  • Single ducts or multi-duct bundles, sized to the design.
  • Each run proofed with a mandrel before handoff.
  • Pull tape installed, and ends capped and sealed.
  • Warning tape and tracer wire placed where the design calls for them.
What you get
  • Proofed, capped conduit ready for cable
  • Footage by run, recorded for billing
03

Fiber Placement

We pull or air-blow fiber optic cable through new and existing duct and leave it ready for the splicing crew.

How we do it
  • Pulling tension monitored to stay within the cable's rating.
  • Slack loops coiled and stored in handholes where the plan calls for them.
  • Cable tagged and labeled at every access point.
  • A clean handoff to the splicing crew.
What you get
  • Placed cable with slack stored to plan
  • Footage and sequential markings recorded
04

Handholes, Vaults, and Pedestals

Access points are set level, at grade, and in the right place, so splicers and future crews can work them.

How we do it
  • Excavated, bedded, and set to finished grade.
  • Conduit entries made to the design.
  • Backfilled and compacted around the structure.
  • Lids labeled to the owner's standard.
What you get
  • A photo of every structure, set and closed
  • Locations marked on the redlines
05

Potholing and Utility Verification

Before the drill turns, existing utilities at every crossing are exposed and confirmed by sight, not just by paint marks.

How we do it
  • 811 locate tickets called and kept current for the work area.
  • Locate marks checked against the prints before work starts.
  • Crossings exposed by vacuum excavation or careful hand digging.
  • The depth and location of each utility recorded.
What you get
  • Potholing records for each crossing
  • Conflicts flagged to you before they cost a day
06

Surface Restoration

When the work is done, the right-of-way goes back the way we found it.

How we do it
  • Sod, seed, and straw for yards and shoulders.
  • Concrete and asphalt repairs for driveways, sidewalks, and roads.
  • Pits and bore paths cleaned of drilling fluid and debris.
  • Before-and-after photos taken at each site.
What you get
  • Restoration photos for closeout
  • Fewer callbacks from property owners

Have a job that needs to go underground?

Send us the location, footage, and timeline, and we will follow up within one business day.